Second Runway Fully Opened at Sabiha Gökçen
  1. News
  2. Aviation News
  3. Second Runway Fully Opened at Sabiha Gökçen

Second Runway Fully Opened at Sabiha Gökçen

The second runway at Sabiha Gökçen Airport has been fully opened. Obstacle restrictions have been removed, and the 24L runway has officially started serving take-off and landing operations.

At Istanbul Sabiha Gökçen International Airport, the second runway numbered 06R-24L has now started serving at full capacity for both take-off and landing operations.

Obstacles Removed

Previously, only take-offs were permitted in the 24L direction, while landings could not be performed due to obstacle restrictions. Following the successful completion of works carried out by the Airport Authority HEAŞ, the required flight checks were conducted, and the 24L direction was officially commissioned for landing operations.

First Landing Performed by an AJet Aircraft

With the new arrangement, the 24L runway can now be fully utilised with direct approach and ILS service. The first landing operation on the runway was performed today at 13:00 by an AJet aircraft operating the Şırnak – Istanbul flight.

Air Traffic Relief Expected

With the second runway being commissioned at full capacity, operational efficiency at Istanbul Sabiha Gökçen Airport is expected to increase, providing significant relief in heavy air traffic.

Editör
© AeroHaber.com / Mevlüt Zor – mevlutzorr@gmail.com
Aero Haber X-Twitter you can follow his account. Follow
Second Runway Fully Opened at Sabiha Gökçen
Comment

Your email address will not be published. Required fields are marked *

Follow Us
Chat about News with AeroHaber.com